Group experience

Tashkent Olympic City

A 100-hectare sports city built for the 2025 Asian Youth Games and Para Games: a main stadium, four indoor halls and fifteen outdoor courts.

Location
Tashkent, Uzbekistan
Type
Sports venues · steel structures
Status
Completed 2025
Our role
Group experience · steel structure & installation
Project cost
USD 289 million
Site area
≈ 100 hectares
Building area
103,333 m²
Venues
Stadium · ball games hall · natatorium · velodrome · combat sports hall
Overview

Our group's scope was the steel structure and installation engineering — including the main stadium's long-span steel roof with tensioned membrane and the velodrome's single-layer cable-net roof.

The complex was built to Chinese standards with a full-roof photovoltaic system, 5G coverage, BIM and a digital twin for operation, and seismic design to grade 9.

Group experience figures are taken from the HAO Contracting company profile and refer to projects delivered by our team and group companies.

Next project

Qinwang Block Residential

View project