Tashkent Olympic City
A 100-hectare sports city built for the 2025 Asian Youth Games and Para Games: a main stadium, four indoor halls and fifteen outdoor courts.
- Location
- Tashkent, Uzbekistan
- Type
- Sports venues · steel structures
- Status
- Completed 2025
- Our role
- Group experience · steel structure & installation
- Project cost
- USD 289 million
- Site area
- ≈ 100 hectares
- Building area
- 103,333 m²
- Venues
- Stadium · ball games hall · natatorium · velodrome · combat sports hall
Overview
Our group's scope was the steel structure and installation engineering — including the main stadium's long-span steel roof with tensioned membrane and the velodrome's single-layer cable-net roof.
The complex was built to Chinese standards with a full-roof photovoltaic system, 5G coverage, BIM and a digital twin for operation, and seismic design to grade 9.
Group experience figures are taken from the HAO Contracting company profile and refer to projects delivered by our team and group companies.